Nisutlin Bay Bridge Rehabilitation
Location: Teslin, Yukon
Scope of Work: Ongoing maintenance contract for a 584-metre-long bridge. We provided engineered access solutions to reach multiple repair areas efficiently while keeping the bridge open to traffic. Scope included repairing corroded floor stringer connections, replacing severely damaged stringers, localized welding on the open grid deck, bearing repairs, and concrete restoration on abutments. The project was particularly challenging due to the presence of lead paint and the large span of the structure
Year Completed: 2018-2024