Little Rancheria Bridge Rehabilitation

Location: KM 1035, Alaska Highway #1

Scope of Work: SServed as General Contractor for the reinforcement of the bridge’s bottom chord using a continuous strengthening plate. Due to the bridge’s design and high traffic volume, work was carried out 24 hours a day to maintain public safety. Scope included fabrication, painting, and installation of the plate, development of a detailed traffic management plan, and coordination with a third-party NDT company after cracks were discovered in some structural members.

Year Completed: 2021