Engineer Creek Bridge Replacement

Location: KM 193, Dempster Highway

Scope of Work: Assisted Boreal Engineering with the installation of a new precast concrete bridge by performing all required structural welding. Our team ensured high-quality welds to support the assembly and long-term durability of the structure.

Year Completed: 2021